图片名称

DSJ300 offshore oil drilling platform

At 5:00 pm on April 15, 2014, the DSJ300 offshore oil drilling platform built by Bohai Equipment Liaohe Heavy Industry Co., Ltd. safely sailed into the Liaohe River under the support of 40 Changlin high-strength airbags. The DSJ300 platform is 65m in length and 60.2m in width, and its launching weight has exceeded the 10,000-ton mark for the first time. The successful launch of the platform marks another solid step towards larger and more complex ship types in the field of offshore engineering.

CASE DETAILS


At 5:00 pm on April 15, 2014, the DSJ300 offshore oil drilling platform built by Bohai Equipment Liaohe Heavy Industry Co., Ltd. safely sailed into the Liaohe River under the support of 40 Changlin high-strength airbags. The DSJ300 platform is 65m in length and 60.2m in width, and its launching weight has exceeded the 10,000-ton mark for the first time. The successful launch of the platform marks another solid step towards larger and more complex ship types in the field of offshore engineering.

ENGINEERING CASE