图片名称

10pcs 2*15m Marine Airbag send to USA customer

On9thJune,2017,ourUSAcustomerorder10pcs2*15mMarineAirbag.Bestproductsqualitywinthebestcustomers,believethebrandpower,believecustomersfeedback.buildingthelongtimewithouranycustomers.

2017

06-29

the project of large scale dock caisson launching and installation was finished successfully in panama

Onthe28thFebruary2017,withjointendeavoursfromallpartiesconcerned,theprojectoflargescaledockcaissonlaunchingandinstallationwasfinishedsuccessfully.Thislargescaledockisbuiltforapowerplantbeingbuiltinpan

2017

03-29

indigenously designed DCM deep mixing engineering ship launching

WarmlywelcomefirstindigenouslydesignedDCMdeepmixingengineeringshiplaunching.ThisprojectistakenbyTHESHIPAIRBAGSANDFENDERS TECHNICAL RESEARCHCENTEROFSHANDONGCHANGLIN,whichcreateaanothernewrecordinthefie

2016

10-19

Big Diameter Marine Airbags Sent To Indonesia

Onthe18thSeptember,2016,25unitsmarineairbagssenttoIndonesia.AirbagSize:Shiplaunchingmarineairbagsvariesfrom0.8mto2.5mindiameter,5.0mto24.0minlong.AirbagApplication:Theyareusedtolaunchshipsaswellasothe

2016

09-18

Pneumatic rubber fender sent to singapore

August18th,2016,16unitsofpneumaticrubberfenderwithChanglinBrandsenttowininginternationalgroup.

2016

08-24

3 units 1.7m diameter 3m long pneumatic rubber fender sent to Indonesia

23thAugust2016,3units1.7mdiameter3mlonghighqualitypneumaticrubberfenderofChanglinBrandsenttoIndonesia.

2016

08-24

3,000 dwt refrigerated?fish?ship?was launched smoothly

At12:586thApril,2016,A30,00dwtrefrigeratedfishshipwaslaunchedsmoothly,whichisownedbyJINGHAIGROUP-RONGCHENGYUANTONGSHIPYARDCO.,LTD.Thisshipiswith98.68mlong,14.5mwide,8.6mdeep,itslaunchedweightupto2100t

2016

04-15

Jinan Changlin Airbag Container Factory Co.,Ltd was broadcast by CCTV

At8:35pm15thMarch,2016,StandardizedChina-BigShipGoToSeawasbroadcastonCCTV10setofscienceeducationchannel-ApproachingScience,whichrecordmarineairbagswithindependentintellectualpropertyrightshavegottengl

2016

03-22

he Floating dock “103”was launched successfully.

On8thDecember2015,afteronemonth’repairment,theFloatingdock“103”waslaunchedsuccessfully.Ourtechnicalteamfullyaccordtothesolutionrequirementtoensurethelaunchingsafty.

2016

01-04

The exporting task of 2015 have been finished

The exporting task of 2015 have been finished as last container loaded in our factory in 7th December.With the influence of economic crisis , domestic ship launching market has been in an unprecedente

2015

12-21